Visit our contact us page to find the best department or person to meet your needs.
Public Works Directory
Public Works Contacts
| Canada | ||
|---|---|---|
| Public Works: | Please visit community connect contact form. | |
| Public Works: | ||
| U.S. | ||
|---|---|---|
| Covering the States of ND, MN, WI, SD, MT: | Manager Public Works Jacob.Anderson@cpkcr.com |
|
| Covering the States of KS, AR, OK, TX, LA, MS, AL, and TN: | Manager Public Works Chris.Ashley@cpkcr.com |
|
| Covering the States of IL, IA, MO, ME, MI, NY, and VT: | Manager Public Works |
|
| Flagging Requests and Rights of Entry for Northern States: | Supervisor Public Works Charles.Kretchman@cpkcr.com |
|
| General Questions for the U.S.: | PublicWorks@cpkcr.com | |
| Covering the States of ND, MN, WI, SD, MT: | ||
| Covering the States of KS, AR, OK, TX, LA, MS, AL, and TN: | ||
| Covering the States of IL, IA, MO, ME, MI, NY, and VT: | ||
| Flagging Requests and Rights of Entry for Northern States: | ||
| General Questions for the U.S.: | ||
| Canada | ||
|---|---|---|
| CBYD: | 1 888-678-7272, press option #3
1 800-387-1833, press option #3 |
Call_B4UDig@cpkcr.com |
| Permit for Utilities: | To ensure all pipes and wires including signal cables are located, identified and marked. A permit is required before contacting CBYD. Fill out the form and we will get back to you as soon as possible. |
|
| CBYD: | ||
| Permit for Utilities: | ||
| U.S. | ||
|---|---|---|
| CBYD: | 1 888-678-7272, press option #3
1 800-387-1833, press option #3 |
Call_B4UDig@cpkcr.com |
| Right of way application: | U.S. Utility and Right of Way application | |
| CBYD: | ||
| Right of way application: | ||
| Mexico | ||
|---|---|---|
| Authorization: | The first step is to request the project’s authorization by the corresponding State SCT Center. Once the authorization is given, the following documentation needs to be sent to the KCSM offices at Av. Manuel L. Barragán No. 4850 Norte, Colonia Hidalgo C.P. 64290 in Monterrey, N.L. Attention: Utility Crossings |
|
| Authorization: | ||
| Canada | ||
|---|---|---|
| Crossing Utility: | Fill out the form and we will get back to you as soon as possible. | |
| Parallel Utility: | Real_estatecanada@cpkcr.com | |
| Crossing Utility: | ||
| Parallel Utility: | ||
| U.S. | ||
|---|---|---|
| Right of way application: | U.S. Utility and Right of Way application | |
| Right of way application: | ||
| Mexico | ||
|---|---|---|
| Authorization: | The first step is to request the project’s authorization by the corresponding State SCT Center. Once the authorization is given, the following documentation needs to be sent to the KCSM offices at Av. Manuel L. Barragán No. 4850 Norte, Colonia Hidalgo C.P. 64290 in Monterrey, N.L. Attention: Utility Crossings |
|
| Authorization: | ||